Midhunatech | ERPNext Implementation, LIMS & Plant Integration
ERPNext on Frappe Framework ยท 9+ plants live

Enterprise ERP for manufacturing, with the lab and the plant floor inside it

Midhunatech implements ERPNext on the Frappe Framework โ€” finance, stores, production, HR and GST โ€” then extends it with a full LIMS and live data from your PLC, weighbridge and biometric devices. Open source core, so there is no per-user licence fee. Our engineers commission it at your site.

Tally migration
GST & e-invoice
LIMS included
PLC / SCADA ready
Live Plant Dashboard
LIVE
Raw Material
3,22,640
+12.5%
Ethanol Output
1,56,560
+8.2%
Recovery
95.14%
+2.1%
Samples Cleared
18 / 19
1 on hold
Every figure read from plant instruments โ€” no manual entry

Built on ERPNext and the Frappe Framework

A proven open-source ERP used by thousands of companies, implemented and extended by us for Indian process manufacturing.

โ‚น0 / userNo seat licence. Give every supervisor a login.
Your dataRuns on your server or cloud. Database stays yours.
Custom builtWhat ERPNext lacks, we build as a separate app.
On-site teamHyderabad engineers who come to your plant.

How an implementation actually runs

Not a demo and a login. Eight stages, each with a signed deliverable before the next one starts.

STAGE 01 โ€” 1 to 2 weeks

Process study on site

  • Department-wise as-is process maps
  • Copy of every register and format in use
  • Gap register: standard ERPNext vs your need
  • Scope document signed by your team
STAGE 02 โ€” 1 to 2 weeks

Accounts and masters

  • Chart of accounts mapped from your Tally groups
  • Cost centres by plant, section and utility
  • Item master with UOM, HSN and batch settings
  • Warehouse, tank and yard locations
STAGE 03 โ€” 1 to 3 weeks

Data migration

  • Opening trial balance and party balances
  • Stock with valuation, open POs and GRNs
  • Asset register with accumulated depreciation
  • Line-by-line reconciliation before cutover
STAGE 04 โ€” 2 to 4 weeks

Configuration

  • Role permissions department by department
  • Approval workflows with amount-based routing
  • Naming series matching your existing numbers
  • Print formats for invoice, GRN, gate pass, CoA
STAGE 05 โ€” 3 to 8 weeks

Custom development

  • Process documents your industry needs
  • Reports like recovery, yield and cost per unit
  • Management dashboards and alerts
  • Source code handed over to you
STAGE 06 โ€” 2 to 6 weeks

Integration commissioning

  • PLC tag mapping with your instrumentation team
  • Weighbridge and biometric device testing
  • Lab instrument output into LIMS samples
  • Signed verification sheet for every device
STAGE 07 โ€” 2 to 4 weeks

Training and parallel run

  • On-site training in Telugu, Hindi or English
  • One-page work instruction per role
  • Full cycle run beside your existing books
  • Go-live checklist signed per department
STAGE 08 โ€” ongoing

Support and AMC

  • Backups with quarterly restore drills
  • Upgrades tested on staging first
  • Ticket, phone and WhatsApp support
  • Statutory changes applied as notified

ERP modules, configured for an Indian plant

Every module below is set up around how your plant already works โ€” the points listed are what we actually configure inside each one.

Financial accounting

  • Multi-company with inter-company journals
  • Cost centre and project-wise P&L
  • Budget control that warns or blocks
  • Schedule III grouping for audit

GST and statutory

  • GSTR-1, 2B and 3B working sheets
  • e-Invoice IRN and QR at submit
  • e-Way bill generation and cancellation
  • TDS, TCS and state excise registers

Inventory and stores

  • Batch and serial control with shelf life
  • Moving average or FIFO per item group
  • Multi-store, bin and tank-level stock
  • Reorder from actual consumption rates

Production

  • Multi-level BOM with scrap and by-products
  • Work orders with operation-wise routing
  • Job cards booked from the shop floor
  • Actual vs standard cost per order

Procurement

  • Indent to RFQ to quotation comparison
  • GRN with quality inspection hold
  • Landed cost for freight, duty, insurance
  • Three-way match before payment

Sales and dispatch

  • Dispatch blocked until batch is released
  • Weighbridge net weight on delivery note
  • CoA attached to the invoice automatically
  • Vehicle allocation and gate pass

HR and payroll

  • Biometric attendance with shift detection
  • Three-shift and rotating roster rules
  • PF, ESI, PT, income tax and Form 16
  • Contractor labour and gate register

Assets and maintenance

  • Companies Act and IT Act depreciation
  • Preventive schedules on running hours
  • Breakdown log with downtime cost
  • Spares consumption linked to the asset

Quality and LIMS

  • Incoming, in-process and final inspection
  • Non-conformance with root cause and CAPA
  • Supplier rejection and debit note flow
  • Extends into the full LIMS below

LIMS โ€” your lab inside the same ERP

Sample login to certificate of analysis, sitting on the same batch record as production and dispatch. A failed result can hold the tanker before it reaches the gate.

Sample login and labelling

Samples raised automatically at defined process points or scanned in at the counter. Barcode label carries sample ID, point and due time.

Analyst worklists

Each shift's analyst sees only what is due, with method and instrument assigned. Overdue tests escalate to the QC head.

Direct instrument capture

GC, density meter, pH meter, spectrometer and hardness tester results land against the sample. No transcription step.

Specifications and out-of-spec

Limits per grade and per customer. An OOS result opens an investigation, blocks release and records who approved the retest.

Certificate of analysis

Built from approved results only, on your letterhead with method references, and attached to the invoice automatically.

Calibration and audit trail

Instrument calibration due dates, reagent expiry, retained samples, and every result edit stored with who, when and why.

Certificate of AnalysisCOA/25-26/1182 ยท ENA 99.95%
ParameterMethodSpecResult
Alcohol contentIS 323โ‰ฅ 99.9099.95PASS
Acidity as aceticIS 323โ‰ค 20.08.4PASS
AldehydesGC-FIDโ‰ค 30.012.7PASS
MethanolGC-FIDโ‰ค 50.021.3PASS
Residue on evaporationIS 323โ‰ค 15.018.6OOS
Batch held automatically. Investigation INV/0114 open with the QC head. Dispatch stays blocked until release.

The ERP reads your instruments directly

Most ERP vendors give you a data-entry screen and call it plant integration. Our gateway reads the controller and posts the value straight into the ERP record. Read-only โ€” your control network is not touched.

One reading, end to end

FERMENTER-1 ยท TT-301 ยท sampled every second
01
Field instrument
RTD in fermenter 1, 4โ€“20 mA to the panel
33.90 ยฐC
02
PLC / DCS
Siemens S7-1500, tag DB12.DBD40
scan 100 ms
03
Our gateway
Reads and buffers if the link drops
0 records lost
04
ERP record
Written to the batch, not a spreadsheet
BATCH/25-26/0418
05
What comes out
Shift report, yield, CoA, e-way bill
06:05 daily
A deviation on this tag raised an alert at 34.20 ยฐC and logged who acknowledged it โ€” with no operator entry anywhere in the chain.
OPC UA / OPC DA

Controller data

Certificate-based sessions to Siemens, ABB, Rockwell and Honeywell systems without loading your control network.

MODBUS TCP / RTU

Meters and drives

Energy meters, flow meters, VFDs, boiler panels and level transmitters, with scaling handled per device.

PROFINET / S7 / ETHERNET IP

Native links

Direct reads where no OPC server exists, so an older panel does not need replacing to get its data out.

RS-232 / RS-485

Weighbridge

Gross, tare and net read off the indicator. GRN raised on exit, ticket printed, no re-keyed weight.

BIOMETRIC

Attendance devices

ESSL, Matrix and ZKTeco readers synced into HR with shift detection and contractor gate registers.

LAB INSTRUMENTS

Test equipment

GC, density and alcohol meters, pH, spectrometers and hardness testers export into the LIMS sample.

HISTORIAN / SQL

Existing systems

Where a SCADA or historian is already installed we read from it instead of replacing your investment.

GOVERNMENT PORTALS

Statutory filing

GST, e-invoice, e-way bill, state excise and CPCB reporting built from the same plant records.

Siemens S7-300/400/1200/1500 Allen-Bradley ControlLogix ABB AC500 / 800xA Honeywell Experion Schneider M340 / M580 Delta & Mitsubishi Yokogawa Centum WinCC / FactoryTalk / iFIX

Industries we have delivered in

Same ERP core each time. Different process documents, different drivers, different lab methods.

Ethanol & ENA distilleries

grain ยท molasses ยท dual feed
  • Fermentation batch sheet with temperature, pH, alcohol
  • Column profiles for stripper, PRC and rectifier
  • Recovery per tonne, steam and coal per litre
  • DDGS and by-product yield reconciliation
  • State excise registers and CPCB reporting
  • Tanker dispatch released only against a CoA

Aluminium extrusion & casting

billet ยท press ยท anodising
  • Heat number traceability from melt to delivery
  • Spectrometer alloy results into the LIMS sample
  • Die life, scrap and recovery per press run
  • Anodising bath and coating thickness records
  • Section-wise costing with live power use
  • Customer drawings and tolerance records

Textile & fabric

spinning ยท dyeing ยท finishing
  • Dyeing recipe card with bath temperature and time
  • Loom stops, efficiency and shift production
  • Shade matching and GSM results in the lab
  • Order-wise costing with yarn, dye and utilities
  • Rejection analysis by machine and operator
  • Live order tracking for sales and customers

Process & engineering

chemicals ยท food ยท fabrication
  • Batch and lot genealogy across multi-level BOMs
  • Machine-level OEE from existing controllers
  • Utility consumption per unit produced
  • Inspection plans at every stage
  • Job costing that reconciles to the ledger
  • Maintenance triggered by running hours

What buyers usually ask us first

What does it cost per user?

Nothing. The platform is open source with no seat licence, so you pay for implementation, custom work and support โ€” not for logins.

Cloud or on-premise?

Either. Plants with a strict IT policy run it in-house with off-site backup. Groups with several units usually run cloud with a gateway per site.

Are we locked in to you?

No. The platform is open source, your custom code is handed over, and the database stays yours. Any competent partner can take over.

Do you replace our SCADA?

No. If a working SCADA or historian exists we read from it. If not, we go directly to the controllers, read-only.

Can we start small?

Yes, and most do. Finance, stores and purchase first, then production and plant data, then the lab. Each phase priced separately.

Who does the work?

Our own Hyderabad engineers, on your site for the study, commissioning, training and go-live โ€” not a call centre.

9+Plants deployed
100%Log books eliminated
โ‚น0Per-user licence fee
9moAverage ROI achieved
99.9%Hosted uptime

What changed after go-live

ENA / Ethanol

Our shift supervisors spent three hours every morning compiling production reports by hand. The system now pulls it from the instruments and the complete report is waiting at 6:05 am.

BR
Brijesh Reddy Buyyani
Chief Executive Officer, RBOL
โ˜…โ˜…โ˜…โ˜…โ˜…
Aluminium

Inventory variances dropped to almost nothing in the first month. GST filing that took two days now takes half an hour because the documents are already correct.

SK
Suresh Kumar Agarwal
Managing Director, Sumangal Aluminium
โ˜…โ˜…โ˜…โ˜…โ˜…
Textile

Live process monitoring with automatic alerts means deviations are caught while the batch is still running. Our rejection rate fell by more than thirty percent.

CK
CK Fabrics
Director, Operations
โ˜…โ˜…โ˜…โ˜…โ˜…
Aluminium

The zero licence fee model was decisive. We added users at no extra cost and the cloud has been rock solid โ€” no unplanned downtime in fourteen months.

SW
Swaroop
Managing Director, RALPRO Aluminium
โ˜…โ˜…โ˜…โ˜…โ˜…

Start with a scoping visit

Send your chart of accounts, a month of shift reports and your instrument list. We will come to the plant and tell you which modules cover you as-is, what needs custom work, and the phased cost โ€” before you commit to anything.

Free consultation
On-site demo
Phased rollout
Source code handed over